Guide · Updated November 2026
Do You Need Planning Permission for Gates, Barriers or Bollards?
In England you can usually put up a gate up to 1 m high next to a road used by vehicles, or up to 2 m high elsewhere, without planning permission. Bollards and barriers on your own land often need none, but anything on the public highway always needs the highway authority's consent.
- UK-wide
- All makes repaired
- Safety tested & certified
Gates
Under permitted development in England, gates, walls and fences can be up to 1 m high where they adjoin a highway used by vehicles and up to 2 m elsewhere. Go above that and you need planning permission. Similar limits apply in Wales, Scotland and Northern Ireland, with local differences, so check with your council.
When permitted development does not apply
- Listed buildings and their grounds
- Some conservation areas and estates with an Article 4 direction
- New-build estates where the original permission removed these rights
- Where a planning condition on the property says otherwise
Bollards
Bollards within your own driveway or car park are not normally treated as development needing permission. On a public pavement, verge or road you cannot install anything yourself. Only the highway authority can place or licence bollards there.
Barriers and height restrictors
A barrier or height restrictor on private land is usually acceptable, but the height limits above can catch tall structures near a road. Councils also look at whether vehicles will queue back onto the highway while waiting for a barrier or gate to open.
Set-back from the road
Highway officers generally want gates set back far enough for a vehicle to pull clear of the carriageway while they open. Around 5 to 6 m is a common request for a car, more for commercial entrances.
Leasehold, shared drives and covenants
Planning is only one permission. A leaseholder usually needs the freeholder's consent. A shared driveway needs everyone with a right of way to agree. Some estates have covenants against gates. We can provide drawings and specifications to support an application or a request to a managing agent.
Related products
Questions we get asked
Does automating an existing gate need permission?
No. Adding motors to a lawful gate is not development.
Can gates open outwards?
Not over a public highway or footpath. Outward opening within your own land is fine.
Who do I ask?
Your local planning authority for planning, and the highway authority (often the county or unitary council) for anything touching the road.
Get a free survey and fixed quote
Tell us what the entrance is and what you want it to do. A photo and a rough width is enough to start.